The ordinances reproduced on this website are derived
from the updated computer files used to produce the official Revised Municipal Code for the City of Stevens Point,
but are unofficial. The ordinances on this web site cannot be certified under s. 889.08,
Wis. Stats., and cannot be considered prima facie evidence under s. 889.04, Wis. Stats. Certain tables and maps
that are a part of the official Revised Municipal Code for the City of Stevens Point are not included in the ordinance
files reproduced on this website. Please consult the bound Revised Municipal Code for the City of Stevens Point,
available in the City
Clerk's Office, for the official text.
1.0 Statutory Authorization, Finding Of Fact, Statement Of Purpose, Title And General Provisions
1.1 Statutory Authorization
1.2 Finding of Fact
1.3 Statement of Purpose
1.4 Title
1.5 General Provisions
(1) Areas to be Regulated
(2) Official Maps and Revisions
(3) Establishment of Districts
(4) Locating Floodplain Boundaries
(5) Removal of Lands from Floodplain
(6) Compliance
(7) Municipalities and State Agencies Regulated
(8) Abrogation and Greater Restrictions
(9) Interpretation
(10) Warning and Disclaimer of Liability
(11) Severability
(12) Annexed Areas for Cities/Villages
(13) General Development Standards
2.0 General Standards Applicable To All Floodplain
2.1 Hydraulic and Hydrologic Analyses
2.2 Watercourse Alterations
2.3 Chapter 30, 31, Wis. Stats., Development
2.4 Public or Private Campgrounds
3.0 Floodway District (FW)
3.1 Applicability
3.2 Permitted Uses
3.3 Standards for Development
3.4 Prohibited Uses
4.0 Floodfringe District (FF)
4.1 Applicability
4.2 Permitted Use
4.3 Standards for Development
5.0 General Floodplain District (GFP)
5.1 Applicability
5.2 Permitted Uses
5.3 Standards for Development
5.4 Determining Floodway/Floodfringe Limits
6.0 Nonconforming Uses
6.1 General
6.2 Floodway Areas
6.3 Floodfringe Areas
7.0 Administration
7.1 Zoning Administrator
7.2 Zoning Agency
7.3 Board of Adjustment/Appeals
7.4 To Review Appeals of Permit Denials
7.5 Floodproofing
7.6 Public Information
8.0 Amendment
8.1 General
8.2 Procedures
9.0 Enforcement And Penalties
10.0 Definitions
23.08 B. Floodplain Ordinance
1.0 Statutory Authorization, Finding Of Fact, Statement Of Purpose, Title And General Provisions
1.1 Statutory Authorization
This ordinance is adopted pursuant to the authorization in ss. 62.23 and the requirements in s. 87.30, Stats.
1.2 Finding Of Fact
Uncontrolled development and use of the floodplains and rivers of this municipality would impair the public health,
safety, convenience, general welfare and tax base.
1.3 Statement Of Purpose
This ordinance is intended to regulate floodplain development to:
(1) Protect life, health and property;
(2) Minimize expenditures of public funds for flood
control projects;
(3) Minimize rescue and relief efforts undertaken
at the expense of the taxpayers;
(4) Minimize business interruptions and other economic
disruptions;
(5) Minimize damage to public facilities in the
floodplain;
(6) Minimize the occurrence of future flood blight
areas in the floodplain;
(7) Discourage the victimization of unwary land
and homebuyers;
(8) Prevent increases in flood heights that could
increase flood damage and result in conflicts between property owners; and
(9) Discourage development in a floodplain if there
is any practicable alternative to locate the activity, use or structure outside of the floodplain.
1.4 Title
This ordinance shall be known as the Floodplain Zoning Ordinance for Stevens Point, Wisconsin.
1.5 General Provisions
(1) Areas To Be Regulated
This ordinance regulates all areas that would be
covered by the regional flood or base flood.
Note: Base flood elevations are derived from the flood profiles in the Flood Insurance Study. Regional flood elevations
may be derived from other studies. Areas covered by the base flood are identified as A-Zones on the Flood Insurance
Rate Map.
(2) Official Maps & Revisions
The boundaries of all floodplain districts are designated
as floodplains or A Zones on the maps listed below and the revisions in the Stevens Point Floodplain Appendix.
Any change to the base flood elevations (BFE) in the Flood Insurance Study (FIS) or on the Flood Insurance Rate
Map (FIRM) must be reviewed and approved by the DNR and FEMA before it is effective. No changes to regional flood
elevations (RFEs) on non-FEMA maps shall be effective until approved by the DNR. These maps and revisions are on
file in the office of the Inspection Department, Stevens Point. If more than one map or revision is referenced,
the most current approved information shall apply.
Official Maps : Based on the FIS
Flood Insurance Rate Map (FIRM), panel number 550342
0005 B, dated June 1, 1983; with corresponding profiles that are based on the Flood Insurance Study (FIS) dated
; Flood Boundary and Floodway Map (FBFW), panel number 550342 0005, dated June 1, 1983;
(3) Establishment Of Districts
The regional floodplain areas are divided into three
districts as follows:
(a) The Floodway District (FW) is the channel of
a river or stream and those portions of the floodplain adjoining the channel required to carry the regional floodwaters.
(b) The Floodfringe District (FF) is that portion
of the floodplain between the regional flood limits and the floodway.
(c) The General Floodplain District (GFP) is those
areas that have been or may be covered by floodwater during the regional flood.
(4) Locating Floodplain Boundaries
Discrepancies between boundaries on the official
floodplain zoning map and actual field conditions shall be resolved using the criteria in paragraphs (a) or (b)
below. If a significant difference exists, the map shall be amended according to s. 8.0. The zoning administrator
can rely on a boundary derived from a profile elevation to grant or deny a land use permit, whether or not a map
amendment is required. The zoning administrator shall be responsible for documenting actual predevelopment field
conditions and the basis upon which the district boundary was determined and for initiating any map amendments
required under this section. Disputes between the zoning administrator and an applicant over the district boundary
line shall be settled according to s. 7.3(3) and the criteria in (a) and (b) below.
(a) If flood profiles exist, the map scale and the
profile elevations shall determine the district boundary. The regional or base flood elevations shall govern if
there are any discrepancies.
(b) Where flood profiles do not exist, the location of the boundary shall be determined by the map scale, visual
on site inspection and any information provided by the Department.
Note: Where the flood profiles are based on established
base flood elevations from a FIRM, FEMA must also approve any map amendment pursuant to s. 8.1 (6).
(5) Removal Of Lands From Floodplain
Compliance with the provisions of this ordinance shall not be grounds for removing land from the floodplain unless
it is filled at least two feet above the regional or base flood elevation, the fill is contiguous to land outside
the floodplain, and the map is amended pursuant to s. 8.0.
Note: This procedure does not remove the requirements for the mandatory purchase of flood insurance. The property
owner must contact FEMA to request a Letter of Map Change (LOMC).
(6) Compliance
Any development or use within the areas regulated by this ordinance shall be in compliance with the terms of this
ordinance, and other applicable local, state, and federal regulations.
(7) Municipalities And State Agencies Regulated
Unless specifically exempted by law, all cities, villages, towns, and counties are required to comply with this
ordinance and obtain all necessary permits. State agencies are required to comply if s. 13.48(13), Stats., applies.
The construction, reconstruction, maintenance and repair of state highways and bridges by the Wisconsin Department
of Transportation is exempt when s. 30.2022, Stats., applies.
(8) Abrogation And Greater Restrictions
(a) This ordinance supersedes all the provisions
of any municipal zoning ordinance enacted under ss. 59.69, 59.692 or 59.694 for counties; s. 62.23 for cities;
or s. 61.35 for villages; or s. 87.30, Stats., which relate to floodplains. If another ordinance is more restrictive
than this ordinance, that ordinance shall continue in full force and effect to the extent of the greater restrictions,
but not otherwise.
(b) This ordinance is not intended to repeal, abrogate or impair any existing deed restrictions, covenants or easements.
If this ordinance imposes greater restrictions, the provisions of this ordinance shall prevail.
(9) Interpretation
In their interpretation and application, the provisions of this ordinance are the minimum requirements liberally
construed in favor of the governing body and are not a limitation on or repeal of any other powers granted by the
Wisconsin Statutes. If a provision of this ordinance, required by ch. NR 116, Wis. Adm. Code, is unclear, the provision
shall be interpreted in light of the standards in effect on the date of the adoption of this ordinance or in effect
on the date of the most recent text amendment to this ordinance.
(10) Warning And Disclaimer Of Liability
The flood protection standards in this ordinance are based on engineering experience and scientific research. Larger
floods may occur or the flood height may be increased by man made or natural causes. This ordinance does not imply
or guarantee that nonfloodplain areas or permitted floodplain uses will be free from flooding and flood damages.
Nor does this ordinance create liability on the part of, or a cause of action against, the municipality or any
officer or employee thereof for any flood damage that may result from reliance on this ordinance.
(11) Severability
Should any portion of this ordinance be declared unconstitutional or invalid by a court of competent jurisdiction,
the remainder of this ordinance shall not be affected.
(12) Annexed Areas For Cities And Villages
The Portage County floodplain zoning provisions in effect on the date of annexation shall remain in effect and
shall be enforced by the municipality for all annexed areas until the municipality adopts and enforces an ordinance
which meets the requirements of ch. NR 116, Wis. Adm. Code and the National Flood Insurance Program (NFIP). These
annexed lands are described on the municipality's official zoning map. County floodplain zoning provisions are
incorporated by reference for the purpose of administering this section and are on file in the office of the municipal
zoning administrator. All plats or maps of annexation shall show the regional flood elevation and the location
of the floodway.
(13) General Development Standards
The community shall review all permit applications to determine whether proposed building sites will be reasonably
safe from flooding. If a proposed building site is in a flood-prone area, all new construction and substantial
improvements shall be designed or modified and adequately anchored to prevent flotation, collapse, or lateral movement
of the structure resulting from hydrodynamic and hydrostatic loads; be constructed with materials resistant to
flood damage; be constructed by methods and practices that minimize flood damages; and be constructed with electrical,
heating, ventilation, plumbing, and air conditioning equipment and other service facilities designed and/or located
so as to prevent water from entering or accumulating within the components during conditions of flooding. Subdivisions
shall be reviewed for compliance with the above standards. All subdivision proposals (including manufactured home
parks) shall include regional flood elevation and floodway data for any development that meets the subdivision
definition of this ordinance.
2.0 General Standards Applicable To All Floodplain
Districts
2.1 Hydraulic And Hydrologic Analyses
(1) Except as allowed in par. (3) below, no floodplain
development shall:
(a) Obstruct flow, defined as development which
blocks the conveyance of floodwaters by itself or with other development, increasing regional flood height; or
(b) Increase regional flood height due to floodplain storage area lost, which equals or exceeds 0.01 foot.
(2) The zoning administrator shall deny permits
if it is determined the proposed development will obstruct flow or increase regional flood heights 0.01 foot or
more, based on the officially adopted FIRM or other adopted map, unless the provisions of sub. (3) are met.
(3) Obstructions or increases equal to or greater than 0.01 foot may only be permitted if amendments are made to
this ordinance, the official floodplain zoning maps, floodway lines and water surface profiles, in accordance with
s. 8.0.
Note: This section refers to obstructions or increases
in base flood elevations as shown on the officially adopted FIRM or other adopted map. Any such alterations must
be reviewed and approved by FEMA and the DNR.
2.2 Watercourse Alterations
No land use permit to alter or relocate a watercourse in a mapped floodplain shall be issued until the local official
has notified in writing all adjacent municipalities, the Department and FEMA regional offices and required the
applicant to secure all necessary state and federal permits. The flood carrying capacity of any altered or relocated
watercourse shall be maintained.
As soon as is practicable, but not later than six
months after the date of the watercourse alteration or relocation, the zoning administrator shall notify FEMA of
the changes by submitting appropriate technical or scientific data in accordance with NFIP guidelines that shall
be used to revise the FIRM, risk premium rates and floodplain management regulations as required.
2.3 Chapter 30, 31, Wis. Stats., Development
Development which requires a permit from the Department, under chs. 30 and 31, Wis. Stats., such as docks, piers,
wharves, bridges, culverts, dams and navigational aids, may be allowed if the necessary permits are obtained and
amendments to the floodway lines, water surface profiles, BFEs established in the FIS, or other data from the officially
adopted FIRM, or other floodplain zoning maps or the floodplain zoning ordinance are made according to s. 8.0.
2.4 Public Or Private Campgrounds
Public or private campgrounds shall have a low flood damage potential and shall meet the following provisions:
(1) The campground is approved by the Department
of Health and Family Services.
(2) A land use permit for the campground is issued
by the zoning administrator.
(3) The character of the river system and the elevation
of the campground is such that a 72-hour warning of an impending flood can be given to all campground occupants.
(4) There is an adequate flood warning procedure
for the campground that offers the minimum notice required under this section to all persons in the campground.
This procedure shall include a written agreement between the campground owner, the municipal emergency government
coordinator and the chief law enforcement official which specifies the flood elevation at which evacuation shall
occur, personnel responsible for monitoring flood elevations, types of warning systems to be used and the procedures
for notifying at-risk parties, and the methods and personnel responsible for conducting the evacuation.
(5) This agreement shall be for no more than one
calendar year, at which time the agreement shall be reviewed and updated - by the officials identified in sub.
(4) - to remain in compliance with all applicable regulations, including those of the state department of health
and family services and all other applicable regulations.
(6) Only camping units are allowed.
(7) The camping units may not occupy any site in
the campground for more than 180 consecutive days, at which time the camping unit must be removed from the floodplain
for a minimum of 24 hours.
(8) All camping units that remain on site for more
than 30 days shall be issued a limited authorization by the campground operator, a written copy of which is kept
on file at the campground. Such authorization shall allow placement of a camping unit for a period not to exceed
180 days and shall ensure compliance with all the provisions of this section.
(9) The municipality shall monitor the limited authorizations
issued by the campground operator to assure compliance with the terms of this section.
(10) All camping units that remain in place for
more than 180 consecutive days must meet the applicable requirements in either s. 3.0 or s. 4.0 for the floodplain
district in which the structure is located.
(11) The campground shall have signs clearly posted
at all entrances warning of the flood hazard and the procedures for evacuation when a flood warning is issued.
(12) All service facilities, including but not limited
to refuse collection, electrical service, natural gas lines, propane tanks, sewage systems and wells shall be properly
anchored and placed at or floodproofed to the flood protection elevation.
3.0 Floodway District (FW)
3.1 Applicability
This section applies to all floodway areas on the floodplain zoning maps and those identified pursuant to s. 5.4.
3.2 Permitted Uses
The following open space uses are allowed in the floodway district and the floodway areas of the general floodplain
district, if
they are not prohibited by any other ordinance;
they meet the standards in s. 3.3 and 3.4; and
all permits or certificates have been issued according to s. 7.1:
(1) Agricultural uses, such as: farming, outdoor
plant nurseries, horticulture, viticulture and wild crop harvesting.
(2) Nonstructural industrial and commercial uses, such as loading areas, parking areas and airport landing strips.
(3) Nonstructural recreational uses, such as golf courses, tennis courts, archery ranges, picnic grounds, boat
ramps, swimming areas, parks, wildlife and nature preserves, game farms, fish hatcheries, shooting, trap and skeet
activities, hunting and fishing areas and hiking and horseback riding trails, subject to the fill limitations of
s. 3.3(4).
(4) Uses or structures accessory to open space uses, or classified as historic structures that comply with ss.
3.3 and 3.4.
(5) Extraction of sand, gravel or other materials that comply with s. 3.3(4).
(6) Functionally water dependent uses, such as docks, piers or wharves, dams, flowage areas, culverts, navigational
aids and river crossings of transmission lines, and pipelines that comply with chs. 30, 31, Stats.
(7) Public utilities, streets and bridges that comply with s. 3.3(3).
3.3 Standards For Developments In Floodway Areas
(1) General
(a) Any development in floodway areas shall comply
with s. 2.0 and have a low flood damage potential.
(b) Applicants shall provide the following data to determine the effects of the proposal according to s. 2.1:
1. A cross section elevation view of the proposal,
perpendicular to the watercourse, showing if the proposed development will obstruct flow; or
2. An analysis calculating the effects of this proposal on regional flood height.
(c) The zoning administrator shall deny the permit
application if the project will increase flood elevations upstream or downstream 0.01 foot or more, based on the
data submitted for par. (b) above.
(2) Structures
Structures accessory to permanent open space uses, classified as historic structures, or functionally dependent
on a waterfront location may be allowed by permit if the structures comply with the following criteria:
(a) The structures are not designed for human habitation
and do not have a high flood damage potential;
(b) The structures are constructed and placed on the building site so as to increase flood heights less than 0.01
foot and minimally obstruct the flow of floodwaters. Structures shall be constructed with the long axis parallel
to the flow of floodwaters and on the same line as adjoining structures;
(c) The structures are properly anchored to prevent them from floating away and restricting bridge openings or
other restricted sections of the stream or river; and
(d) The structures have all service facilities at or above the flood protection elevation.
(3) Public Utilities, Streets And Bridges
Public utilities, streets and bridges may be allowed by permit, if:
(a) Adequate floodproofing measures are provided
to the flood protection elevation; and
(b) Construction meets the development standards of s. 2.1.
(4) Fills Or Deposition Of Materials
Fills or deposition of materials may be allowed by permit, if:
(a) The requirements of s. 2.1 are met;
(b) No material is deposited in the navigable channel unless a permit is issued by the Department pursuant to ch.
30, Stats., and a permit pursuant to s. 404 of the Federal Water Pollution Control Act, Amendments of 1972, 33
U.S.C. 1344 has been issued, if applicable, and the other requirements of this section are met;
(c) The fill or other materials will be protected against erosion by riprap, vegetative cover, sheet piling or
bulkheading; and
(d) The fill is not classified as a solid or hazardous material.
3.4 Prohibited Uses
All uses not listed as permitted uses in s. 3.2 are prohibited, including the following uses:
(1) Habitable structures, structures with high flood
damage potential, or those not associated with permanent open space uses;
(2) Storing materials that are buoyant, flammable, explosive, injurious to property, water quality, or human, animal,
plant, fish or other aquatic life;
(3) Uses not in harmony with or detrimental to uses permitted in the adjoining districts;
(4) Any private or public sewage systems, except portable latrines that are removed prior to flooding and systems
associated with recreational areas and Department-approved campgrounds that meet the applicable provisions of local
ordinances and ch. COMM 83, Wis. Adm. Code.
(5) Any public or private wells which are used to obtain potable water, except those for recreational areas that
meet the requirements of local ordinances and chs. NR 811 and NR 812, Wis. Adm. Code;
(6) Any solid or hazardous waste disposal sites;
(7) Any wastewater treatment ponds or facilities, except those permitted under s. NR 110.15(3)(b), Wis. Adm. Code;
(8) Any sanitary sewer or water supply lines, except those to service existing or proposed development located
outside the floodway which complies with the regulations for the floodplain area occupied.
4.0 Floodfringe District (FF)
4.1 Applicability
This section applies to all floodfringe areas shown on the floodplain zoning maps and those identified pursuant
to s. 5.4.
4.2 Permitted Uses
Any structure, land use, or development is allowed in the floodfringe district if the standards in s. 4.3 are met,
the use is not prohibited by this or any other ordinance or regulation and all permits or certificates specified
in s. 7.1 have been issued.
4.3 Standards For Development In Floodfringe Areas
S. 2.1 shall apply in addition to the following requirements according to the use requested.
(1) Residential Uses
Any habitable structure, including a manufactured home, which is to be erected, constructed, reconstructed, altered,
or moved into the floodfringe area, shall meet or exceed the following standards;
(a) The elevation of the lowest floor, excluding
the basement or crawlway, shall be at or above the flood protection elevation on fill. The fill shall be one foot
or more above the regional flood elevation extending at least 15 feet beyond the limits of the structure. The Department
may authorize other floodproofing measures if the elevations of existing streets or sewer lines makes compliance
with the fill standards impractical;
(b) The basement or crawlway floor may be placed at the regional flood elevation if it is floodproofed to the flood
protection elevation. No basement or crawlway floor is allowed below the regional flood elevation;
(c) Contiguous dryland access shall be provided from a structure to land outside of the floodplain, except as provided
in par. (d).
(d) In developments where existing street or sewer line elevations make compliance with par. (c) impractical, the
municipality may permit new development and substantial improvements where access roads are at or below the regional
flood elevation, if:
1. The municipality has written assurance from police,
fire and emergency services that rescue and relief will be provided to the structure(s) by wheeled vehicles during
a regional flood event; or
2. The municipality has a natural disaster plan approved by Wisconsin Emergency Management and the Department.
(2) Accessory Structures Or Uses
An accessory structure or use not connected to a principal structure shall be constructed with its lowest floor
at or above the regional flood elevation, subject to flood velocities of no more than two feet per second, and
shall meet all the provisions of ss. 3.3 (2) (a), (b), (c), (d), and sub. (6) below.
(3) Commercial Uses
Any commercial structure which is erected, altered or moved into the floodfringe area shall meet the requirements
of s. 4.3(1). Subject to the requirements of sub. (6), storage yards, surface parking lots and other such uses
may be placed at lower elevations if an adequate warning system exists to protect life and property.
(4) Manufacturing And Industrial Uses
Any manufacturing or industrial structure which is erected, altered or moved into the floodfringe area shall be
protected to the flood protection elevation using fill, levees, floodwalls, or other flood proofing measures in
s. 7.5. Subject to the requirements of sub. (6), storage yards, surface parking lots and other such uses may be
placed at lower elevations if an adequate warning system exists to protect life and property.
(5) Storage Of Materials
Materials that are buoyant, flammable, explosive, or injurious to property, water quality or human, animal, plant,
fish or aquatic life shall be stored at or above the flood protection elevation or floodproofed in compliance with
s. 7.5. Adequate measures shall be taken to ensure that such materials will not enter the water body during flooding.
(6) Public Utilities, Streets And Bridges
All utilities, streets and bridges shall be designed to be compatible with comprehensive floodplain development
plans; and
(a) When failure of public utilities, streets and
bridges would endanger public health or safety, or where such facilities are deemed essential, construction of
and substantial improvements to such facilities may only be permitted if they are floodproofed in compliance with
s. 7.5 to the flood protection elevation;
(b) Minor roads or nonessential utilities may be constructed at lower elevations if they are designed to withstand
flood forces to the regional flood elevation.
(7) Sewage Systems
All on site sewage disposal systems shall be floodproofed, pursuant to s. 7.5, to the flood protection elevation
and shall meet the provisions of all local ordinances and ch. COMM 83, Wis. Adm. Code.
(8) Wells
All wells shall be floodproofed, pursuant to s. 7.5, to the flood protection elevation and shall meet the provisions
of chs. NR 811 and NR 812, Wis. Adm. Code.
(9) Solid Waste Disposal Sites
Disposal of solid or hazardous waste is prohibited in floodfringe areas.
(10) Deposition Of Materials
Any deposited material must meet all the provisions of this ordinance.
(11) Manufactured Homes
(a) Owners or operators of all manufactured home
parks and subdivisions shall provide adequate surface drainage to minimize flood damage, and prepare, secure approval
and file an evacuation plan, indicating vehicular access and escape routes, with local emergency management authorities.
(b) In existing manufactured home parks, all new homes, replacement homes on existing pads, and substantially improved
homes shall:
1. have the lowest floor elevated to the flood protection
elevation; and
2. be anchored so they do not float, collapse or
move laterally during a flood.
(c) Outside of existing manufactured home parks,
including new manufactured home parks and all single units outside of existing parks, all new, replacement and
substantially improved manufactured homes shall meet the residential development standards for the floodfringe
in s. 4.3(1).
(12) Mobile Recreational Vehicles
All mobile recreational vehicles that are on site for 180 consecutive days or more or are not fully licensed and
ready for highway use shall meet the elevation and anchoring requirements in s. 4.3 (11)(b) and (c). A mobile recreational
vehicle is ready for highway use if it is on its wheels or jacking system, is attached to the site only by quick-disconnect
utilities and security devices and has no permanently attached additions.
5.0 General Floodplain District (GFP)
5.1 Applicability
The provisions for this district shall apply to all floodplains for which flood profiles are not available or where
flood profiles are available but floodways have not been delineated. Floodway and floodfringe districts shall be
delineated when adequate data is available.
5.2 Permitted Uses
Pursuant to s. 5.4, it shall be determined whether the proposed use is located within a floodway or floodfringe
area.
Those uses permitted in floodway (s. 3.2) and floodfringe areas (s. 4.2) are allowed within the general floodplain
district, according to the standards of s. 5.3, provided that all permits or certificates required under s. 7.1
have been issued.
5.3 Standards For Development In The General Floodplain District
S. 3.0 applies to floodway areas, s. 4.0 applies to floodfringe areas. The rest of this ordinance applies to either
district.
5.4 Determining Floodway And Floodfringe Limits
Upon receiving an application for development within
the general floodplain district, the zoning administrator shall:
(1) Require the applicant to submit two copies of
an aerial photograph or a plan which shows the proposed development with respect to the general floodplain district
limits, stream channel, and existing floodplain developments, along with a legal description of the property, fill
limits and elevations, building floor elevations and flood proofing measures;
(2) Require the applicant to furnish any of the following information deemed necessary by the Department to evaluate
the effects of the proposal upon flood height and flood flows, regional flood elevation and to determine floodway
boundaries:
(a) A typical valley cross section showing the stream
channel, the floodplain adjoining each side of the channel, the cross sectional area to be occupied by the proposed
development, and all historic high water information;
(b) Plan (surface view) showing elevations or contours of the ground; pertinent structure, fill or storage elevations;
size, location and layout of all proposed and existing structures on the site; location and elevations of streets,
water supply, and sanitary facilities; soil types and other pertinent information;
(c) Profile showing the slope of the bottom of the channel or flow line of the stream;
(d) Specifications for building construction and materials, floodproofing, filling, dredging, channel improvement,
storage, water supply and sanitary facilities.
(3) Transmit one copy of the information described
in pars. (1) and (2) to the Department Regional office along with a written request for technical assistance to
establish regional flood elevations and, where applicable, floodway data. Where the provisions of s. 7.1(2)(c)
apply, the applicant shall provide all required information and computations to delineate floodway boundaries and
the effects of the project on flood elevations.
6.0 Nonconforming Uses
6.1 General
(1) Applicability
If these standards conform with s. 59.69(10), Stats., for counties or s. 62.23(7)(h), Stats., for cities and villages,
they shall apply to all modifications or additions to any nonconforming use or structure and to the use of any
structure or premises which was lawful before the passage of this ordinance or any amendment thereto.
(2) The existing lawful use of a structure or its accessory use which is not in conformity with the provisions
of this ordinance may continue subject to the following conditions:
(a) No modifications or additions to a nonconforming
use or structure shall be permitted unless they comply with this ordinance. The words "modification"
and "addition" include, but are not limited to, any alteration, addition, modification, structural repair,
rebuilding or replacement of any such existing use, structure or accessory structure or use. Ordinary maintenance
repairs are not considered an extension, modification or addition; these include painting, decorating, paneling
and the replacement of doors, windows and other nonstructural components and the maintenance, repair or replacement
of existing private sewage or water supply systems or connections to public utilities. Ordinary maintenance repairs
do not include any costs associated with the repair of a damaged structure.
The construction of a deck that does not exceed 200 square feet and that is adjacent to the exterior wall of a
principal structure is not an extension, modification or addition. The roof of the structure may extend over a
portion of the deck in order to provide safe ingress and egress to the principal structure.
(b) If a nonconforming use or the use of a nonconforming structure is discontinued for 12 consecutive months, it
is no longer permitted and any future use of the property, and any structure or building thereon, shall conform
to the applicable requirements of this ordinance;
(c) The municipality shall keep a record which lists all nonconforming uses and nonconforming structures, their
present equalized assessed value, the cost of all modifications or additions which have been permitted, and the
percentage of the structure's total current value those modifications represent;
(d) No modification or addition to any nonconforming structure or any structure with a nonconforming use, which
over the life of the structure would exceed 50% of its present equalized assessed value, shall be allowed unless
the entire structure is permanently changed to a conforming structure with a conforming use in compliance with
the applicable requirements of this ordinance. Contiguous dry land access must be provided for residential and
commercial uses in compliance with s. 4.3(1). The costs of elevating a nonconforming building or a building with
a nonconforming use to the flood protection elevation are excluded from the 50% provisions of this paragraph;
(e) 1. Except as provided in subd. 2., if any nonconforming structure or any structure with a nonconforming use
is destroyed or is substantially damaged, it cannot be replaced, reconstructed or rebuilt unless the use and the
structure meet the current ordinance requirements. A structure is considered substantially damaged if the total
cost to restore the structure to its predamaged condition exceeds 50% of the structure's present equalized assessed
value.
2. For nonconforming buildings that are damaged
or destroyed by a nonflood disaster, the repair or reconstruction of any such nonconforming building may be permitted
in order to restore it after the nonflood disaster, provided that the nonconforming building will meet all of the
minimum requirements under 44 CFR Part 60, or under the regulations promulgated thereunder.
(f) A nonconforming historic structure may be altered
if the alteration will not preclude the structures continued designation as a historic structure, the alteration
will comply with s. 3.3 (1), flood resistant materials are used, and construction practices and floodproofing methods
that comply with s. 7.5 are used.
6.2 Floodway Areas
(1) No modification or addition shall be allowed
to any nonconforming structure or any structure with a nonconforming use in a floodway area, unless such modification
or addition:
(a) Has been granted a permit or variance which
meets all ordinance requirements;
(b) Meets the requirements of s. 6.1;
(c) Will not increase the obstruction to flood flows or regional flood height; and
(d) Any addition to the existing structure shall be floodproofed, pursuant to s. 7.5, by means other than the use
of fill, to the flood protection elevation.
(e) The portions of the structure located below the RFE must be constructed of flood-resistant materials.
(f) It must be designed to allow for the automatic entry of floodwaters.
(2) No new on site sewage disposal system, or addition
to an existing on site sewage disposal system, except where an addition has been ordered by a government agency
to correct a hazard to public health, shall be allowed in a floodway area. Any replacement, repair or maintenance
of an existing on site sewage disposal system in a floodway area shall meet the applicable requirements of all
municipal ordinances and ch. COMM 83, Wis. Adm. Code.
(3) No new well or modification to an existing well used to obtain potable water shall be allowed in a floodway
area. Any replacement, repair or maintenance of an existing well in a floodway area shall meet the applicable requirements
of all municipal ordinances and chs. NR 811 and NR 812, Wis. Adm. Code.
6.3 Floodfringe Areas
(1) No modification or addition shall be allowed
to any nonconforming structure or any structure with a nonconforming use unless such modification or addition has
been granted a permit or variance by the municipality, and the modification or addition shall be placed on fill
or floodproofed to the flood protection elevation in compliance with the standards for that particular use in s.
4.3, except where s. 6.3(2) is applicable.
(2) Where compliance with the provisions of par. (1) would result in unnecessary hardship and only where the structure
will not be used for human habitation or be associated with a high flood damage potential, the Board of Adjustment/Appeals,
using the procedures established in s. 7.3, may grant a variance from those provisions of par. (1) for modifications
or additions, using the criteria listed below. Modifications or additions which are protected to elevations lower
than the flood protection elevation may be permitted if:
(a) No floor is allowed below the regional flood
elevation for residential or commercial structures;
(b) Human lives are not endangered;
(c) Public facilities, such as water or sewer, will not be installed;
(d) Flood depths will not exceed two feet;
(e) Flood velocities will not exceed two feet per second; and
(f) The structure will not be used for storage of materials as described in s. 4.3(6).
(3) If neither the provisions of par. (1) or (2)
above can be met, one addition to an existing room in a nonconforming building or a building with a nonconforming
use may be allowed in the floodfringe, if the addition:
(a) Meets all other regulations and will be granted
by permit or variance;
(b) Does not exceed 60 square feet in area; and
(c) In combination with other previous modifications or additions to the building, does not exceed 50% of the present
equalized assessed value of the building.
(4) All new private sewage disposal systems, or
addition to, replacement, repair or maintenance of a private sewage disposal system shall meet all the applicable
provisions of all local ordinances and ch. COMM 83, Wis. Adm. Code.
(5) All new wells, or addition to, replacement, repair or maintenance of a well shall meet the applicable provisions
of this ordinance and ch. NR 811 and NR 812, Wis. Adm. Code.
7.0 Administration
Where a zoning administrator, planning agency or a board of adjustment/appeals has already been appointed to administer
a zoning ordinance adopted under ss. 59.69, 59.692 or 62.23(7), Stats., these officials shall also administer this
ordinance.
7.1 Zoning Administrator
(1) The zoning administrator is authorized to administer
this ordinance and shall have the following duties and powers:
(a) Advise applicants of the ordinance provisions,
assist in preparing permit applications and appeals, and assure that the regional flood elevation for the proposed
development is shown on all permit applications.
(b) Issue permits and inspect properties for compliance with provisions of this ordinance, and issue certificates
of compliance where appropriate.
(bm) Inspect all damaged floodplain structures and perform a substantial damage assessment to determine if substantial
damage to the structures has occurred.
(c) Keep records of all official actions such as:
1. All permits issued, inspections made, and work
approved;
2. Documentation of certified lowest floor and regional flood elevations for floodplain development;
3. .Records of water surface profiles, floodplain zoning maps and ordinances, nonconforming uses and structures
including changes, appeals, variances and amendments.
4. All substantial damage assessment reports for floodplain structures.
(d) Submit copies of the following items to the
Department Regional office:
1. Within 10 days of the decision, a copy of any
decisions on variances, appeals for map or text interpretations, and map or text amendments;
2. Copies of any case by case analyses, and any other information required by the Department including an annual
summary of the number and types of floodplain zoning actions taken.
3. Copies of substantial damage assessments performed and all related correspondence concerning the assessments.
(e) Investigate, prepare reports, and report violations
of this ordinance to the municipal zoning agency and attorney for prosecution. Copies of the reports shall also
be sent to the Department Regional office.
(f) Submit copies of text and map amendments and biennial reports to the FEMA Regional office.
(2) Land Use Permit
A land use permit shall be obtained before any new development or any repair or change in the use of a building
or structure, including sewer and water facilities, may be initiated. Application to the zoning administrator shall
include:
(a) General Information
1. Name and address of the applicant, property owner
and contractor;
2. Legal description, proposed use, and whether it is new construction or a modification;
(b) Site Development Plan
A site plan drawn to scale shall be submitted with
the permit application form and shall contain:
1. Location, dimensions, area and elevation of the
lot;
2. Location of the ordinary highwater mark of any abutting navigable waterways;
3. Location of any structures with distances measured from the lot lines and street center lines;
4. Location of any existing or proposed on site sewage systems or private water supply systems;
5. Location and elevation of existing or future access roads;
6. Location of floodplain and floodway limits as determined from the official floodplain zoning maps;
7. The elevation of the lowest floor of proposed buildings and any fill using National Geodetic and Vertical Datum
(NGVD);
8. Data sufficient to determine the regional flood
elevation in NGVD at the location of the development and to determine whether or not the requirements of s. 3.0
or 4.0 are met; and
9. Data to determine if the proposed development will cause an obstruction to flow or an increase in regional flood
height or discharge according to s. 2.1. This may include any of the information noted in s. 3.3(1).
(c) Data Requirements To Analyze Developments
1. The applicant shall provide all survey data and
computations required to show the effects of the project on flood heights, velocities and floodplain storage, for
all subdivision proposals, as "subdivision" is defined in s. 236, Stats., and other proposed developments
exceeding 5 acres in area or where the estimated cost exceeds $125,000. The applicant shall provide:
a. An analysis of the effect of the development
on the regional flood profile, velocity of flow and floodplain storage capacity;
b. A map showing location and details of vehicular access to lands outside the floodplain; and
c. A surface drainage plan showing how flood damage will be minimized.
d. The estimated cost of the proposal shall include all structural development, landscaping, access and road development,
utilities, and other pertinent items, but need not include land costs.
(d) Expiration
All permits issued under the authority of this ordinance shall expire 365 days after issuance.
(3) Certificate Of Compliance
No land shall be occupied or used, and no building which is hereafter constructed, altered, added to, modified,
repaired, rebuilt or replaced shall be occupied until a certificate of compliance is issued by the zoning administrator,
except where no permit is required, subject to the following provisions:
(a) The certificate of compliance shall show that
the building or premises or part thereof, and the proposed use, conform to the provisions of this ordinance;
(b) Application for such certificate shall be concurrent with the application for a permit;
(c) If all ordinance provisions are met, the certificate of compliance shall be issued within 10 days after written
notification that the permitted work is completed;
(d) The applicant shall submit a certification signed by a registered professional engineer, architect or land
surveyor that the fill, lowest floor and floodproofing elevations are in compliance with the permit issued. Floodproofing
measures also require certification by a registered professional engineer or architect that floodproofing measures
meet the requirements of s. 7.5.
(4) Other Permits
The applicant must secure all necessary permits from federal, state, and local agencies, including those required
by the U.S. Army Corps of Engineers under s. 404 of the Federal Water Pollution Control Act, Amendments of 1972,
33 U.S.C. 1344.
7.2 Zoning Agency
(1) The Plan Commission shall:
(a) oversee the functions of the office of the zoning
administrator; and
(b) review and advise the Governing body on all proposed amendments to this ordinance, maps and text.
(2) This zoning agency shall not
(a) grant variances to the terms of the ordinance
in place of action by the Board of Adjustment/Appeals; or
(b) amend the text or zoning maps in place of official action by the Governing body.
7.3 Board Of Adjustment/Appeals
The Board of Adjustment/Appeals, created under s. 59.694, Stats., for counties or s. 62.23(7)(e), Stats., for cities
or villages, is hereby authorized or shall be appointed to act for the purposes of this ordinance. The Board shall
exercise the powers conferred by Wisconsin Statutes and adopt rules for the conduct of business. The zoning administrator
may not be the secretary of the Board.
(1) Powers And Duties
The Board of Adjustment/Appeals shall:
(a) Appeals Hear and decide appeals where it is
alleged there is an error in any order, requirement, decision or determination made by an administrative official
in the enforcement or administration of this ordinance.
(b) Boundary Disputes Hear and decide disputes concerning the district boundaries shown on the official floodplain
zoning map.
(c) Variances Hear and decide, upon appeal, variances from the ordinance standards.
(2) Appeals To The Board
(a) Appeals to the board may be taken by any person
aggrieved, or by any officer or department of the municipality affected by any decision of the zoning administrator
or other administrative officer. Such appeal shall be taken within 30 days unless otherwise provided by the rules
of the board, by filing with the official whose decision is in question, and with the board, a notice of appeal
specifying the reasons for the appeal. The official whose decision is in question shall transmit to the board all
records regarding the matter appealed.
(b) Notice And Hearing For Appeals Including Variances
1. Notice The board shall:
a. Fix a reasonable time for the hearing;
b. Publish adequate notice pursuant to Wisconsin Statutes, specifying the date, time, place and subject of the
hearing;
c. Assure that notice shall be mailed to the parties in interest and the Department Regional office at least 10
days in advance of the hearing.
2. Hearing Any party may appear in person or by agent. The board shall:
a. Resolve boundary disputes according to s. 7.3(3).
b. Decide variance applications according to s. 7.3(4).
c. Decide appeals of permit denials according to s. 7.4.
(c) Decision: The final decision regarding the appeal
or variance application shall:
1. Be made within a reasonable time;
2. Be sent to the Department Regional office within 10 days of the decision;
3. Be a written determination signed by the chairman or secretary of the Board;
4. State the specific facts which are the basis for the Board's decision;
5. Either affirm, reverse, vary or modify the order, requirement, decision or determination appealed, in whole
or in part, dismiss the appeal for lack of jurisdiction or grant or deny the variance application;
6. Include the reasons for granting an appeal, describing the hardship demonstrated by the applicant in the case
of a variance, clearly stated in the recorded minutes of the Board proceedings.
(3) Boundary Disputes
The following procedure shall be used by the Board in hearing disputes concerning floodplain district boundaries:
(a) If a floodplain district boundary is established
by approximate or detailed floodplain studies, the flood elevations or profiles shall prevail in locating the boundary.
If none exist, other evidence may be examined.
(b) In all cases, the person contesting the boundary location shall be given a reasonable opportunity to present
arguments and technical evidence to the Board.
(c) If the boundary is incorrectly mapped, the Board should inform the zoning committee or the person contesting
the boundary location to petition the governing body for a map amendment according to s. 8.0.
(4) Variance
(a) The Board may, upon appeal, grant a variance
from the standards of this ordinance if an applicant convincingly demonstrates that:
1. Literal enforcement of the ordinance provisions
will cause unnecessary hardship;
2. The hardship is due to adoption of the floodplain ordinance and unique property conditions, not common to adjacent
lots or premises. In such case the ordinance or map must be amended;
3. The variance is not contrary to the public interest; and
4. The variance is consistent with the purpose of this ordinance in s. 1.3.
(b) In addition to the criteria in par. (a), to
qualify for a variance under FEMA regulations, the following criteria must be met:
1. The variance may not cause any increase in the
regional flood elevation;
2. Variances can only be granted for lots that are less than one-half acre and are contiguous to existing structures
constructed below the RFE;
3. Variances shall only be granted upon a showing of good and sufficient cause, shall be the minimum relief necessary,
shall not cause increased risks to public safety or nuisances, shall not increase costs for rescue and relief efforts
and shall not be contrary to the purpose of the ordinance.
(c) A variance shall not:
1. Grant, extend or increase any use prohibited
in the zoning district.
2. Be granted for a hardship based solely on an economic gain or loss.
3. Be granted for a hardship which is self created.
4. Damage the rights or property values of other persons in the area.
5. Allow actions without the amendments to this ordinance or map(s) required in s. 8.1.
6. Allow any alteration of an historic structure, including its use, which would preclude its continued designation
as an historic structure.
(d) When a floodplain variance is granted the Board
shall notify the applicant in writing that it may increase flood insurance premiums and risks to life and property.
A copy shall be maintained with the variance record.
7.4 To Review Appeals Of Permit Denials
(1) The Zoning Agency (s. 7.2) or Board shall review
all data related to the appeal. This may include:
(a) Permit application data listed in s. 7.1(2).
(b) Floodway/floodfringe determination data in s. 5.4.
(c) Data listed in s. 3.3(1)(b)2. where the applicant has not submitted this information to the zoning administrator.
(d) Other data submitted with the application, or submitted to the Board with the appeal.
(2) For appeals of all denied permits the Board
shall:
(a) Follow the procedures of s. 7.3;
(b) Consider zoning agency recommendations; and
(c) Either uphold the denial or grant the appeal.
(3) For appeals concerning increases in regional
flood elevation the Board shall:
(a) Uphold the denial where the Board agrees with
the data showing an increase in flood elevation. Increases equal to or greater than 0.01 foot may only be allowed
after amending the flood profile and map and all appropriate legal arrangements are made with all adversely affected
property owners.
(b) Grant the appeal where the Board agrees that the data properly demonstrates that the project does not cause
an increase equal to or greater than 0.01 foot provided no other reasons for denial exist.
7.5 Floodproofing
(1) No permit or variance shall be issued until
the applicant submits a plan certified by a registered professional engineer or architect that the floodproofing
measures will protect the structure or development to the flood protection elevation.
(2) Floodproofing measures shall be designed to:
(a) Withstand flood pressures, depths, velocities,
uplift and impact forces and other regional flood factors;
(b) Protect structures to the flood protection elevation;
(c) Anchor structures to foundations to resist flotation and lateral movement; and
(d) Insure that structural walls and floors are watertight to the flood protection elevation, and the interior
remains completely dry during flooding without human intervention.
(3) Floodproofing measures could include:
(a) Reinforcing walls and floors to resist rupture
or collapse caused by water pressure or floating debris.
(b) Adding mass or weight to prevent flotation.
(c) Placing essential utilities above the flood protection elevation.
(d) Installing surface or subsurface drainage systems to relieve foundation wall and basement floor pressures.
(e) Constructing water supply wells and waste treatment systems to prevent the entry of flood waters.
(f) Putting cutoff valves on sewer lines or eliminating gravity flow basement drains.
7.6 Public Information
(1) Place marks on structures to show the depth
of inundation during the regional flood.
(2) All maps, engineering data and regulations shall be available and widely distributed.
(3) All real estate transfers should show what floodplain zoning district any real property is in.
8.0 Amendments
8.1 General
The governing body may change or supplement the floodplain zoning district boundaries and this ordinance in the
manner provided by law. Actions which require an amendment include, but are not limited to, the following:
(1) Any change to the official floodplain zoning
map, including the floodway line or boundary of any floodplain area.
(2) Correction of discrepancies between the water surface profiles and floodplain zoning maps.
(3) Any fill in the floodplain which raises the elevation of the filled area to a height at or above the flood
protection elevation and is contiguous to land lying outside the floodplain.
(4) Any fill or floodplain encroachment that obstructs flow, increasing regional flood height 0.01 foot or more.
(5) Any upgrade to a floodplain zoning ordinance text required by s. NR 116.05, Wis. Adm. Code, or otherwise required
by law, or for changes by the municipality.
(6) All channel relocations and changes to the maps to alter floodway lines or to remove an area from the floodway
or the floodfringe that is based on a base flood elevation from a FIRM requires prior approval by FEMA.
Note: Consult the FEMA web site - fema.gov
- for the map change fee schedule.
8.2 Procedures
Ordinance amendments may be made upon petition of any interested party according to the provisions of s. 62.23,
Stats., for cities and villages, or 59.69, Stats., for counties. Such petitions shall include all necessary data
required by ss. 5.4 and 7.1(2).
(1) The proposed amendment shall be referred to
the zoning agency for a public hearing and recommendation to the governing body. The amendment and notice of public
hearing shall be submitted to the Department Regional office for review prior to the hearing. The amendment procedure
shall comply with the provisions of s. 62.23, Stats., for cities and villages or s. 59.69, Stats., for counties.
(2) No amendments shall become effective until reviewed and approved by the Department.
(3) All persons petitioning for a map amendment that obstructs flow, increasing regional flood height 0.01 foot
or more, shall obtain flooding easements or other appropriate legal arrangements from all adversely affected property
owners and notify local units of government before the amendment can be approved by the governing body.
(4) For amendments in areas with no water surface profiles, the zoning agency or board shall consider data submitted
by the Department, the zoning administrator's visual on site inspections and other available information. (See
s. 1.5(4).)
9.0 Enforcement And Penalties
Any violation of the provisions of this ordinance by any person shall be unlawful and shall be referred to the
municipal attorney who shall expeditiously prosecute all such violators. A violator shall, upon conviction, forfeit
to the municipality a penalty of not less than $35 and not more than $500, together with a taxable cost of such
action. Each day of continued violation shall constitute a separate offense. Every violation of this ordinance
is a public nuisance and the creation may be enjoined and the maintenance may be abated by action at suit of the
municipality, the state, or any citizen thereof pursuant to s. 87.30, Stats.
10.0 Definitions
Unless specifically defined, words and phrases in this ordinance shall have their common law meaning and shall
be applied in accordance with their common usage. Words used in the present tense include the future, the singular
number includes the plural and the plural number includes the singular. The word "may" is permissive,
"shall" is mandatory and is not discretionary.
"A ZONES" Those areas shown on the Official Floodplain Zoning Map which would be inundated by the regional
flood. These areas may be numbered or unnumbered A Zones. The A Zones may or may not be reflective of flood profiles,
depending on the availability of data for a given area.
"ACCESSORY STRUCTURE OR USE" A facility, structure, building or use which is accessory or incidental
to the principal use of a property, structure or building.
"BASE FLOOD" - Means the flood having a one percent chance of being equaled or exceeded in any given
year, as published by FEMA as part of a FIS and depicted on a FIRM.
"BASEMENT" - Any enclosed area of a building having its floor subgrade, i.e., below ground level, on
all sides.
"BUILDING" See STRUCTURE.
"BULKHEAD LINE" A geographic line along a reach of navigable water that has been adopted by a municipal
ordinance and approved by the Department pursuant to s. 30.11, Stats., and which allows limited filling between
this bulkhead line and the original ordinary highwater mark, except where such filling is prohibited by the floodway
provisions of this ordinance.
"CAMPGROUND" - Any parcel of land which is designed, maintained, intended or used for the purpose of
providing sites for nonpermanent overnight use by 4 or more camping units, or which is advertised or represented
as a camping area.
"CAMPING UNIT" - Any portable device, no more than 400 square feet in area, used as a temporary shelter,
including but not limited to a camping trailer, motor home, bus, van, pick-up truck, tent or other mobile recreational
vehicle.
"CERTIFICATE OF COMPLIANCE" A certification that the construction and the use of land or a building,
the elevation of fill or the lowest floor of a structure is in compliance with all of the provisions of this ordinance.
"CHANNEL" B A natural or artificial watercourse with definite bed and banks to confine and conduct normal
flow of water.
"CRAWLWAYS" OR "CRAWL SPACE" - An enclosed area below the first usable floor of a building,
generally less than five feet in height, used for access to plumbing and electrical utilities.
ADECK@ B An unenclosed exterior structure that has no roof or sides, but has a permeable floor which allows the
infiltration of precipitation.
"DEPARTMENT" The Wisconsin Department of Natural Resources.
"DEVELOPMENT" Any artificial change to improved or unimproved real estate, including, but not limited
to, the construction of buildings, structures or accessory structures; the construction of additions or alterations
to buildings, structures or accessory structures; the repair of any damaged structure or the improvement or renovation
of any structure, regardless of percentage of damage or improvement; the placement of buildings or structures;
subdivision layout and site preparation; mining, dredging, filling, grading, paving, excavation or drilling operations;
the storage, deposition or extraction of materials or equipment; and the installation, repair or removal of public
or private sewage disposal systems or water supply facilities.
"DRYLAND ACCESS" A vehicular access route which is above the regional flood elevation and which connects
land located in the floodplain to land outside the floodplain, such as a road with its surface above regional flood
elevation and wide enough for wheeled rescue and relief vehicles.
"ENCROACHMENT" Any fill, structure, equipment, building, use or development in the floodway.
"EXISTING MANUFACTURED HOME PARK OR SUBDIVISION" A parcel of land, divided into two or more manufactured
home lots for rent or sale, on which the construction of facilities for servicing the lots is completed before
the effective date of this ordinance. At a minimum, this would include the installation of utilities, the construction
of streets and either final site grading or the pouring of concrete pads
"EXPANSION TO EXISTING MOBILE/MANUFACTURED HOME PARK" The preparation of additional sites by the construction
of facilities for servicing the lots on which the manufactured homes are to be affixed. This includes installation
of utilities, construction of streets and either final site grading, or the pouring if concrete pads.
"FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA)" The federal agency that administers the National Flood Insurance
Program.
"FLOOD INSURANCE RATE MAP" (FIRM) - A map of a community on which the Federal Insurance Administration
has delineated both special flood hazard areas (the floodplain) and the risk premium zones applicable to the community.
This map can only be amended by the Federal Emergency Management Agency.
"FLOOD" or "FLOODING" B A general and temporary condition of partial or complete inundation
of normally dry land areas caused by one of the following conditions:
The overflow or rise of inland waters,
The rapid accumulation or runoff of surface waters
from any source,
The inundation caused by waves or currents of water
exceeding anticipated cyclical levels along the shore of Lake Michigan or Lake Superior, or
The sudden increase caused by an unusually high
water level in a natural body of water, accompanied by a severe storm, or by an unanticipated force of nature,
such as a seiche, or by some similarly unusual event.
"FLOOD FREQUENCY" The probability of a
flood occurrence which is determined from statistical analyses. The frequency of a particular flood event is usually
expressed as occurring, on the average, once in a specified number of years or as a percent (%) chance of occurring
in any given year.
"FLOODFRINGE" That portion of the floodplain outside of the floodway which is covered by flood waters
during the regional flood and associated with standing water rather than flowing water.
"FLOOD HAZARD BOUNDARY MAP" A map designating approximate flood hazard areas. Flood hazard areas are
designated as unnumbered A Zones and do not contain floodway lines or regional flood elevations. This map forms
the basis for both the regulatory and insurance aspects of the National Flood Insurance Program (NFIP) until superseded
by a Flood Insurance Study and a Flood Insurance Rate Map.
"FLOOD INSURANCE STUDY" A technical engineering examination, evaluation, and determination of the local
flood hazard areas. It provides maps designating those areas affected by the regional flood and provides both flood
insurance rate zones and base flood elevations and may provide floodway lines. The flood hazard areas are designated
as numbered and unnumbered A Zones. Flood Insurance Rate Maps, that accompany the Flood Insurance Study, form the
basis for both the regulatory and the insurance aspects of the National Flood Insurance Program.
"FLOODPLAIN" Land which has been or may be covered by flood water during the regional flood. It includes
the floodway and the floodfringe, and may include other designated floodplain areas for regulatory purposes.
"FLOODPLAIN ISLAND" A natural geologic land formation within the floodplain that is surrounded, but not
covered, by floodwater during the regional flood.
"FLOODPLAIN MANAGEMENT" Policy and procedures to insure wise use of floodplains, including mapping and
engineering, mitigation, education, and administration and enforcement of floodplain regulations.
"FLOOD PROFILE" A graph or a longitudinal profile line showing the relationship of the water surface
elevation of a flood event to locations of land surface elevations along a stream or river.
"FLOODPROOFING" Any combination of structural provisions, changes or adjustments to properties and structures,
water and sanitary facilities and contents of buildings subject to flooding, for the purpose of reducing or eliminating
flood damage.
"FLOOD PROTECTION ELEVATION" An elevation of two feet of freeboard above the water surface profile elevation
designated for the regional flood. (Also see: FREEBOARD.)
"FLOOD STORAGE" Those floodplain areas where storage of floodwaters has been taken into account during
analysis in reducing the regional flood discharge.
"FLOODWAY" The channel of a river or stream and those portions of the floodplain adjoining the channel
required to carry the regional flood discharge.
"FREEBOARD" A safety factor expressed in terms of a specified number of feet above a calculated flood
level. Freeboard compensates for any factors that cause flood heights greater than those calculated, including
ice jams, debris accumulation, wave action, obstruction of bridge openings and floodways, the effects of watershed
urbanization, loss of flood storage areas due to development and aggregation of the river or stream bed.
"HABITABLE STRUCTURE" Any structure or portion thereof used or designed for human habitation.
"HEARING NOTICE" Publication or posting meeting the requirements of Ch. 985, Stats. For appeals, a Class
1 notice, published once at least one week (7 days) before the hearing, is required. For all zoning ordinances
and amendments, a Class 2 notice, published twice, once each week consecutively, the last at least a week (7 days)
before the hearing. Local ordinances or bylaws may require additional notice, exceeding these minimums.
"HIGH FLOOD DAMAGE POTENTIAL" Damage that could result from flooding that includes any danger to life
or health or any significant economic loss to a structure or building and its contents.
"HISTORIC STRUCTURE" - Any structure that is either:
Listed individually in the National Register of
Historic Places or preliminarily determined by the Secretary of the Interior as meeting the requirements for individual
listing on the National Register,
Certified or preliminarily determined by the Secretary
of the Interior as contributing to the historical significance of a registered historic district or a district
preliminarily determined by the Secretary to qualify as a registered historic district,
Individually listed on a state inventory of historic
places in states with historic preservation programs which have been approved by the Secretary of the Interior,
or
Individually listed on a local inventory of historic
places in communities with historic preservation programs that have been certified either by an approved state
program, as determined by the Secretary of the Interior; or by the Secretary of the Interior in states without
approved programs.
"INCREASE IN REGIONAL FLOOD HEIGHT" A
calculated upward rise in the regional flood elevation, equal to or greater than 0.01 foot, based on a comparison
of existing conditions and proposed conditions which is directly attributable to development in the floodplain
but not attributable to manipulation of mathematical variables such as roughness factors, expansion and contraction
coefficients and discharge.
"LAND USE" Any nonstructural use made of unimproved or improved real estate. (Also see DEVELOPMENT.)
"MANUFACTURED HOME" A structure transportable in one or more sections, which is built on a permanent
chassis and is designed to be used with or without a permanent foundation when connected to required utilities.
The term "manufactured home" includes a mobile home but does not include a "mobile recreational
vehicle."
"MOBILE RECREATIONAL VEHICLE" - A vehicle which is built on a single chassis, 400 square feet or less
when measured at the largest horizontal projection, designed to be self-propelled, carried or permanently towable
by a licensed, light-duty vehicle, is licensed for highway use if registration is required and is designed primarily
not for use as a permanent dwelling, but as temporary living quarters for recreational, camping, travel or seasonal
use. Manufactured homes that are towed or carried onto a parcel of land, but do not remain capable of being towed
or carried, including park model homes, do not fall within the definition of "mobile recreational vehicles."
"MUNICIPALITY" or "MUNICIPAL" The county, city or village governmental units enacting, administering
and enforcing this zoning ordinance.
"NGVD" or "NATIONAL GEODETIC VERTICAL DATUM" Elevations referenced to mean sea level datum,
1929 adjustment.
"NEW CONSTRUCTION" - For floodplain management purposes, "new construction" means structures
for which the start of construction commenced on or after the effective date of floodplain zoning regulations adopted
by this community and includes any subsequent improvements to such structures. For the purpose of determining flood
insurance rates, it includes any structures for which the "start of construction" commenced on or after
the effective date of an initial FIRM or after December 31, 1974, whichever is later, and includes any subsequent
improvements to such structures.
"NONCONFORMING STRUCTURE" An existing lawful structure or building which is not in conformity with the
dimensional or structural requirements of this ordinance for the area of the floodplain which it occupies. (For
example, an existing residential structure in the floodfringe district is a conforming use. However, if the lowest
floor is lower than the flood protection elevation, the structure is nonconforming.)
"NONCONFORMING USE" An existing lawful use or accessory use of a structure or building which is not in
conformity with the provisions of this ordinance for the area of the floodplain which it occupies. (Such as a residence
in the floodway.)
"OBSTRUCTION TO FLOW" Any development which blocks the conveyance of floodwaters such that this development
alone or together with any future development will cause an increase in regional flood height.
"OFFICIAL FLOODPLAIN ZONING MAP" That map, adopted and made part of this ordinance, as described in s.
1.5(2), which has been approved by the Department and FEMA.
"OPEN SPACE USE" Those uses having a relatively low flood damage potential and not involving structures.
"ORDINARY HIGHWATER MARK" The point on the bank or shore up to which the presence and action of surface
water is so continuous as to leave a distinctive mark such as by erosion, destruction or prevention of terrestrial
vegetation, predominance of aquatic vegetation, or other easily recognized characteristic.
"PERSON" An individual, or group of individuals, corporation, partnership, association, municipality
or state agency.
"PRIVATE SEWAGE SYSTEM" A sewage treatment and disposal system serving one structure with a septic tank
and soil absorption field located on the same parcel as the structure. It also means an alternative sewage system
approved by the Department of Commerce, including a substitute for the septic tank or soil absorption field, a
holding tank, a system serving more than one structure or a system located on a different parcel than the structure.
"PUBLIC UTILITIES" Those utilities using underground or overhead transmission lines such as electric,
telephone and telegraph, and distribution and collection systems such as water, sanitary sewer and storm sewer.
"REASONABLY SAFE FROM FLOODING" - Means base flood waters will not inundate the land or damage structures
to be removed from the special flood hazard area and that any subsurface waters related to the base flood will
not damage existing or proposed buildings.
"REGIONAL FLOOD" A flood determined to be representative of large floods known to have occurred in Wisconsin.
A regional flood is a flood with a one percent chance of being equaled or exceeded in any given year, and if depicted
on the FIRM, the RFE is equivalent to the BFE.
"START OF CONSTRUCTION" - The date the building permit was issued, provided the actual start of construction,
repair, reconstruction, rehabilitation, addition, placement, or other improvement was within 180 days of the permit
date. The actual start means either the first placement of permanent construction on a site, such as the pouring
of slab or footings, the installation of piles, the construction of columns, or any work beyond initial excavation,
or the placement of a manufactured home on a foundation. Permanent construction does not include land preparation,
such as clearing, grading and filling, nor does it include the installation of streets and/or walkways, nor does
it include excavation for a basement, footings, piers or foundations or the erection of temporary forms, nor does
it include the installation on the property of accessory buildings, such as garages or sheds not occupied as dwelling
units or not part of the main structure. For an alteration, the actual start of construction means the first alteration
of any wall, ceiling, floor or other structural part of a building, whether or not that alteration affects the
external dimensions of the building.
"STRUCTURE" Any manmade object with form, shape and utility, either permanently or temporarily attached
to, placed upon or set into the ground, stream bed or lake bed, including, but not limited to, roofed and walled
buildings, gas or liquid storage tanks, bridges, dams and culverts.
"SUBDIVISION" - Has the meaning given in s. 236.02(12), Wis. Stats.
"SUBSTANTIAL DAMAGE" - Damage of any origin sustained by a structure, whereby the cost of restoring the
structure to its pre-damaged condition would equal or exceed 50 percent of the equalized assessed value of the
structure before the damage occurred.
"UNNECESSARY HARDSHIP" Where special conditions affecting a particular property, which were not self
created, have made strict conformity with restrictions governing areas, setbacks, frontage, height or density unnecessarily
burdensome or unreasonable in light of the purposes of the ordinance.
"VARIANCE" An authorization by the board of adjustment or appeals for the construction or maintenance
of a building or structure in a manner which is inconsistent with dimensional standards (not uses) contained in
the floodplain zoning ordinance.
"VIOLATION" - The failure of a structure or other development to be fully compliant with the floodplain
zoning ordinance. A structure or other development without required permits, lowest floor elevation documentation,
floodproofing certificates or required floodway encroachment calculations is presumed to be in violation until
such time as that documentation is provided.
"WATERSHED" The entire region contributing runoff or surface water to a watercourse or body of water.
"WATER SURFACE PROFILE" A graphical representation showing the elevation of the water surface of a watercourse
for each position along a reach of river or stream at a certain flood flow. A water surface profile of the regional
flood is used in regulating floodplain areas.
"WELL" means an excavation opening in the ground made by digging, boring, drilling, driving or other
methods, to obtain groundwater regardless of its intended use.
The ordinances reproduced on this website are derived
from the updated computer files used to produce the official Revised Municipal Code for the City of Stevens Point,
but are unofficial. The ordinances on this web site cannot be certified under s. 889.08,
Wis. Stats., and cannot be considered prima facie evidence under s. 889.04, Wis. Stats. Certain tables and maps
that are a part of the official Revised Municipal Code for the City of Stevens Point are not included in the ordinance
files reproduced on this website. Please consult the bound Revised Municipal Code for the City of Stevens Point,
available in the City
Clerk's Office, for the official text.