Prentice Street Project FAQ
What will happen with my mail delivery during the construction?
We do not anticipate any interruption with your mail delivery. If it is determined that the Post Office cannot deliver your mail, temporary mail boxes will be set up at a central location with your address attached. You will be notified by mail should this be necessary.

What will I need to do to have my garbage and recyclables picked up?
Once construction is scheduled to begin, you will be notified by mail to place your garbage and/or recyclables out near the street on your usual pickup day by 7:00 a.m. in clear plastic bags, do NOT use your carts. Clear plastic bags are needed so the collection crews can easily distinguish between garbage and recyclables after distributing the bags to a central location for pick-up. Notifications by mail will also be sent when construction is complete enough for you to resume using your carts.

Will my driveway be closed during construction?
Every reasonable effort will be made to keep your driveway accessible. Access between the removal of the pavement and curb and the installation of the sanitary sewer, storm sewer, water main, placing the gravel, installing the curb, gutter and sidewalk and asphalt paving will be provided, as practicable. However, at times access will be impossible.

Where will I be able to park during construction?
While your driveway is closed, you may NOT park in the immediate project area along Sixth Avenue; however, the Police Department will relax the overnight parking restrictions on adjacent streets in your neighborhood during the construction project.

Will I be assessed for any of the work being done?
You will NOT be assessed for any street work; however, you will be special assessed for the replacement of any clay or non-standard sanitary, storm sewer lateral or water service you may have. A non-standard water service is defined as a water service less than 2-inches in diameter in the street, constructed of galvanized materials, or has no service manhole. Properties that are determined to be in need of a storm sewer lateral that do not currently have one may also be assessed for the new installation. Special assessment notices with associated costs will be mailed to property owners by the City Clerk’s Office in April. Assessment payment options are available to pay within 30-days of receiving your bill, or in 5 or 10 annual installments which will be included with your property tax bill. Interest rates on the 5 or 10 year options are 2.25% and 4.00% respectively. No other work will be special assessed.

What should I do if I want to replace my old sanitary lateral or water service between the house and the sidewalk?
This is the perfect time to schedule the replacement of one or both of your services; However, this work must be done by a private contractor or licensed plumber and a permit from the City Plumbing Inspector is required. If you can coordinate this work during our construction project you may be able to save hundreds of dollars by not having to pay for the removal and replacement of the sidewalk and curb when the connection at the street is made. The curb and sidewalk is being removed and replaced by the city as part of this project. Your contractor or plumber should contact the Stevens Point Water and Wastewater Department at 715-345-5260 to coordinate this work.

Who do I contact if I have any other questions?
Please direct any additional questions or concerns to The City of Stevens Point, Engineering at 715-346-1561 or e-mail . For questions or concerns regarding sanitary sewer, storm sewer and water service, please contact the Stevens Point Water and Wastewater Department at 715-346-5260 or email . Department hours are 7:30 a.m. to 4:00 p.m. Monday through Friday.

To receive notices via email and/or text message whenever news stories regarding this project are posted here, go to our Notify Me Module and sign up for the "Grade Separation Project" News Flashes. News and announcements from this site are also posted on our Facebook Page and Twitter Feed.

Contact
Director of Public Works
1515 Strongs Ave.
Stevens Point, WI 54481
Ph: (715) 346–1561
Email

Office Hours 
Monday - Friday 
7:30 am - 4:00 pm




News Flash - View All
Intersection of Maria Dr. and Prentice St. to be closed
The intersection of Maria Dr. and Prentice St. will be closed beginning Monday, July 24, 2017 for approximately 3 weeks.
Maria Drive Reconstruction Project
The Maria Dr. Reconstruction Project from the intersection of Second St. to First St., will begin Tues., July 18. Work should be completed by late August. Read More
Construction on US 10 - Country Club Dr. to Badger Ave.
Work on US 10 between Country Club & Badger is scheduled to begin as early as Monday, July 17. Work will include pavement repairs, maintenance & repairs on the I-39 overpass; updating signal loop detectors, and installing new signs & pavement markings. Read More
Prentice St. Project Updates
The Prentice St. Reconstruction Project began Monday, May 15. The project is anticipated to be completed by early October. Letters to Residents have been posted to give information, answer questions, provide maps, and more. Read More