Click to Home
Inspections - When Required
The following inspections are required for all new construction. Additions, remodeling, garages, finished basements, etc. will require only the inspections that apply. (Please see required inspections on approved permits for any special inspections required.)
  • Footings (before pouring concrete) 
  • Foundation Walls (before backfilling) 
  • Rough Plumbing (called in by plumber) 
  • Rough Electrical (called in by electrician) 
  • Rough Framing (before insulating) 
  • Insulation (before wall and ceiling finish is applied) 
  • Interior Drain Tile (before pouring basement floor concrete) 
  • Final Plumbing (called in by plumber) 
  • Final Electrical (called in by electrician) 
  • Final Building Occupancy (before moving in)

Resources for Plumbing

City of Wonderful Water
City of Stevens Point, 1515 Strongs Ave., Stevens Point, WI 54481 | Phone 715-346-1569